{"@context":{"@vocab":"https://schema.org/"},"@type":"Report","@id":"https://api.morvs.ai/chemical-investigation/3559#inv","name":"Removal of Hazardous Material from Piping Systems","datePublished":"2004-07-15","description":"This Safety Bulletin identifies specific tasks that facilities should include in all work activities involving piping or equipment opening to ensure the complete removal of hazardous material.","url":"https://www.csb.gov/removal-of-hazardous-material-from-piping-systems/","isAccessibleForFree":true,"license":"https://creativecommons.org/publicdomain/zero/1.0/","investigation":{"tid":3559,"title":"Removal of Hazardous Material from Piping Systems","location":null,"state":null,"status":"completed","final_report_date":"2004-07-15","report_year":2004,"report_url":"https://www.csb.gov/removal-of-hazardous-material-from-piping-systems/","url":"https://api.morvs.ai/chemical-investigation/3559"},"_source":{"data_provider":"AI Analytics","brand_name":"MORVS","brand_url":"https://morvs.ai/","data_provider_url":"https://api.morvs.ai","license":"https://creativecommons.org/publicdomain/zero/1.0/","primary_source":"https://www.csb.gov/investigations/","primary_source_dataset":"U.S. Chemical Safety Board investigations","generated_at":"2026-10-31T16:51:27.610Z"}}