THE DREES COMPANY - HARMONY S/D PHASE B - PART 2

Administrative - Formal · FY2008 · — · Unilateral Administrative Order Without Adjudication · 1000008458

—
Penalty
—
Cost recovery
—
Compliance action

Case

Case Number
04-2008-4760
Type
Administrative - Formal
Lead
EPA
Outcome
Unilateral Administrative Order Without Adjudication
Multimedia
—
Self-disclosure
N

Defendants (2)

Summary

7/1/2008 - ADMINISTRATIVE ORDER ISSUED. ORDER STATES: DURING THE CSWEI, EPA INSPECTORS OBSERVED THE FOLLOWING: RESPONDENT FAILED TO TAKE ALL REASONABLE STEPS TO MINIMIZE OR PREVENT ANY DISCHARGE IN VIOLATION OF THE PERMIT WHICH HAS REASONABLE LIKELIHOOD OF ADVERSELY AFFECTING HUMAN HEALTH OR THE ENVIRONMENT, AS REQUIRED BY PART II OF THE PERMIT AND 401 KAR 5:065 SECTION 1(4). RESPONDENT FAILED TO PROPERLY OPERATE AND MAINTAIN AT ALL TIMES FACILITIES AND SYSTEMS OF TREATMENT AND CONTROL AND RELATED APPURTENANCES WHICH ARE INSTALLED OR USED TO ACHIEVE COMPLIANCE WITH THE CONDITIONS OF THE PERMIT, AS REQUIRED BY PART II OF THE PERMIT AND 401 KAR 5:065 SECTION 1(5). RESPONDENT FAILED TO NOTE CHANGES THAT WERE MADE TO THE BMP PLAN WITHIN SEVEN (7) DAYS IN THOSE CASES WHERE THE ORIGINAL BMP PLAN PROVES TO BE INEFFECTIVE IN CONTROLLING THE DISCHARGE OF POLLUTANTS, OR WHEN THERE IS A CHANGE IN THE DESIGN, CONSTRUCTION, OPERATION OR MAINTENANCE OF THE SITE WHICH HAS A SIGNIFICANT EFFECT ON THE THE POTENTIAL FOR THE DISCHARGE OF POLLUTANTS TO SURFACE WATERS, AS REQUIRED BY PART IV OF THE PERMIT. RESPONDENT FAILED TO DOCUMENT THE TIMING OF SITE STABILIZATION. RESPONDENT FAILED TO THOROUGHLY DOCUMENT INSPECTIONS OF ALL STORM WATER CONTROL MEASURES, DISCHARGE LOCATIONS, AND DISTURBED AREAS OF THE DEVELOPMENT, AS REQUIRED BY PART IV.F OF THE PERMIT. RESPONDENT FAILED TO COMPLY WITH THE PERMIT, AND ALSO FOR DISCHARGES NOT AUTHORIZED BY THE PERMIT.

Source

Authoritative
EPA ECHO
Machine
JSON-LD · Markdown