The facility was inspected by EPA Contractors on January 3, 2008. The Inspection Checklist was reviewed by R Jamison, EPA. The contractor noted that there was a failure to maintain release detection for the USTs and lines and to equip the pressurized lines with an automatic line leak detector. R Jamison concurred and issued a Field Citation from the desk.