← EPA enforcement cases

ECUSTA MILL SUPERFUND SITE (BNK REFERRAL)

Judicial · FY2003 · — · Final Order With Specified Cost Recovery · 104698

—
Penalty
—
Cost recovery
—
Compliance action

Case

Case Number
04-2003-9047
Type
Judicial
Lead
EPA
Outcome
Final Order With Specified Cost Recovery
Multimedia
—
Self-disclosure
N

Defendants (4)

Summary

The Ecusta Mill Site is situated near Pisgah Forest, Transylvania County, North Carolina. The mill began operations in 1938 and manufactured paper products from flax fiber and produced chlorine (for paper bleaching) by using Sorenson mercury cells. A number of entities have owned/operated the mill: Olin Chemical Corp. (1949-1985); Ecusta Corp. (1985-1987); P. H. Glatfelter (1987-2001); and RFS Ecusta, Inc (2001-2002). RFS Ecusta ceased operations in August 2002 and filed Chapter 11 bankruptcy in October 2002. The case was transferred to the U.S. Bankruptcy Court for the Western District of North Carolina in March 2003 and was subsequently converted to Chapter 7 liquidation. SCDHEC notified EPA about the abandonment of the facility in February 2003. EPA conducted a preliminary site assessment in March 2003 and identified a number of threats including approximately 500 abandoned drums of hazardous waste, a landfill that relies on a water pumping system to remain stable, and a 75-acre wastewater treatment lagoon, which relies on an interactive system for proper environmental management. Elevated levels of mercury were discovered in soils near the former chlor-alkali building and in drainage ditches leading to the Davidson River. EPA entered into an Administrative Order on Consent for the Remedial Investigation/ Feasibility Study with P.H. Glatfelter in January 2008 to assess the River Investigation Areas. In April 2008, EPA entered into a Bona Fide Prospective Pu

Source

Authoritative
EPA ECHO
Machine
JSON-LD · Markdown