← EPA enforcement cases

Frank Dale Construction, Ltd. (TXU010331

Administrative - Formal · FY2004 · — · Unilateral Administrative Order Without Adjudication · 107678

—
Penalty
—
Cost recovery
—
Compliance action

Case

Case Number
06-2004-1785
Type
Administrative - Formal
Lead
EPA
Outcome
Unilateral Administrative Order Without Adjudication
Multimedia
—
Self-disclosure
N

Defendants (1)

Summary

A storm water compliance inspection was conducted October 15, 2003, at the construction site of the Arlington Presbyterian Church sanctuary in Arlington, TX. During the inspection it was noted that the Storm Water Pollution Prevention Plan (SWPPP) was inadequate, inspections were not conducted in accordance with permit requirements, and the required signs were not properly posted. Review of the violations indicated the permittee was eligible for the Expedited Settlement Offer (ESO), which was routed for signature.

Source

Authoritative
EPA ECHO
Machine
JSON-LD · Markdown