Bayamon Regional WWTP (River View Sanitary Collection System)

Administrative - Formal · FY2004 · — · Unilateral Administrative Order Without Adjudication · 118969

—
Penalty
—
Cost recovery
—
Compliance action

Case

Case Number
02-2004-3069
Type
Administrative - Formal
Lead
EPA
Outcome
Unilateral Administrative Order Without Adjudication
Multimedia
—
Self-disclosure
N

Defendants (1)

Summary

Raw sewage discharges at a location other than the authorized in the Bayamon Regional WWTP NPDES permit. An 8-inch diameter collapsed sewer pipeline was causing the overflows, that were conveying into Bayamon River. PRASA shall immediately cease and desist the discharge of pollutants into the waters of the United States from the manholes located along the River View Development. Within five (5) days of receipt of this ORDER, PRASA shall install a portable pump with temporary pipeline to replace the collapsed pipeline, thus eliminating the unauthorized discharge of raw sewage. Within 30 calendar days of receipt of the ORDER, PRASA shall initiate the permanent replacement of the collapsed pipeline in River View Development. The replacement of the collapsed pipeline shall be completed on or before October 2004.

Source

Authoritative
EPA ECHO
Machine
JSON-LD · Markdown