* Plan not certified by a professional engineer.
* Plan does not follow sequence of the ruele and/or cross-reference not provided.
* Inspections and tests required by 40 CFR Part 112 are not in accordance with written procedures developed for the facility.
* No training on the applicable pollution control laws, rules, and regulations.
* Adequate records (or NPDES permit records) of drainage from diked areas not maintained.
* Drainage from undiked areas do not flow into catchment basins ponds, or lagoons, or no diversion systems to retain or return a discharge to the facility.
* Containment bypass valves are not sealed closed when not draining rainwater.
* Aboveground tanks are not subject to visual inspections.