← EPA enforcement cases

LEHIGH CEMENT CO

Administrative - Formal · FY2004 · — · Final Order With Penalty · 121745

—
Penalty
—
Cost recovery
—
Compliance action

Case

Case Number
03-2004-0291
Type
Administrative - Formal
Lead
EPA
Outcome
Final Order With Penalty
Multimedia
—
Self-disclosure
N

Defendants (1)

Summary

On June 26, 2002, an authorized EPA representative conducted a compliance evaluation inspection at the Woodsboro Facility. As part of the inspection activities, the EPA inspector toured the Woodsboro Facility, reviewed records and was provided with an explanation of operations by a Woodsboro Facility representative. Based upon the facts, evidence and information obtained during the EPA inspection of the Woodsboro Facility and through a subsequent exchange of information during the ���show cause��� process, the CAFO alleges the following violations of the PCB regulations at the Woodsboro Facility: 1. failure to mark PCB Articles (i.e., the Main Substation PCB Transformer and the Shipping Substation PCB Transformer) located at the Woodsboro Facility with the mark ���ML��� as described in 40 C.F.R. �� 761.45(a), in violation of 40 C.F.R. �� 761.40(c)(1). 2. failure to mark the means of access (i.e., the entrance) to a PCB Transformer (i.e., the Shipping Substation PCB Transformer) located at the Woodsboro Facility with the mark ���ML��� as described in 40 C.F.R. �� 761.45(a) in violation of 40 C.F.R. �� 761.40(j)(1). 3. disposal of PCB liquids from the Woodsboro Facility���s Main Substation PCB Transformer, Shipping Substation PCB Transformer, Motor Control Substation PCB Transformer and Gyradisc Substation PCB Transformer in a manner other than in an incinerator, a high efficiency boiler, or a chemical wast

Source

Authoritative
EPA ECHO
Machine
JSON-LD · Markdown