Alice Isaac Tank Battery

Administrative - Formal · FY2004 · — · Final Order With Penalty · 124017

—
Penalty
—
Cost recovery
—
Compliance action

Case

Case Number
06-2004-4387
Type
Administrative - Formal
Lead
EPA
Outcome
Final Order With Penalty
Multimedia
—
Self-disclosure
N

Defendants (1)

Summary

Summary of Findings * Inspections and tests required by 40 CFR Part 112 are not in accordance with written procedures developed for the facility. * No training on the operation and maintenance of equipment to prevent discharges. * Excessive vegetation which affects the integrity an/or walls of containment system are slightly eroded or have low areas. * Visual inspections of containers, foundation and supports are not conducted periodically for deterioration and maintenance needs. * Above ground valves and pipelines are nto examined periodically ona scheduled basis for general condition (includes items, such as: flange joints, valve glands 2nd bodies, drip pans, pipeline supports, bleeder and gauge valves, polish rods/stuffing box. * Brine and saltwater disposal facilities are not examined often.

Source

Authoritative
EPA ECHO
Machine
JSON-LD · Markdown