Site One, LLC and/or Beachwood, LLC (Cole Creek Town Homes)

Administrative - Formal · FY2004 · — · Final Order With Penalty · 125100

—
Penalty
—
Cost recovery
—
Compliance action

Case

Case Number
04-2004-4525
Type
Administrative - Formal
Lead
EPA
Outcome
Final Order With Penalty
Multimedia
—
Self-disclosure
N

Defendants (2)

Summary

Complaint filed 7/28/2004, proposing a penalty of $32,500. Respondent violated Part VI.D and Part VI.N of the Permit at the Facility by failing to design and implement erosion and sediment controls to retain sediments on-site; by failing to prevent discharges from the Facility which have a reasonable likelihood of having an adverse impact on either human health or the environment; by failing to maintain structural practices, specifically, storm drain inlet protection, sediment traps, and silt fencing to divert flows from exposed areas, store flows, or limit runoff and discharge of pollutants from exposed areas of the Facility; by failing to design, install, and maintain storm water measures at the Facility, specifically, sedimentation pond maintenance, storm drain outlet design and protection, and rock inlet/outlet protection, to control pollutants in storm water discharges; by failing to operate and maintain all systems of treatment and control (and related appurtenances) which are installed or used by the Respondent at the Facility to achieve compliance with the conditions of the permit and the requirements of the SWPP. Respondents violated Part IV.D.2b(2) of the Permit by failing to place velocity dissipation devices at discharge locations at the Facility. Respondents violated Part VI.D.4 of the Permit by failing to initiate an inspection program from a qualified person whom shall inspect disturbed areas of the Facility and areas used for storage of materials that are

Source

Authoritative
EPA ECHO
Machine
JSON-LD · Markdown