This order requires WPSC to upgrade the existing particulate control systems at their BO Furnace and hot metal desulfurization station. These upgrades should decrease the amount of emissions exiting the furnace shop uncontrolled. This order is an interim action and does not release WPSC's liability for previous BOF shop violations.