RIBV AMARILLO, INC (TXU010381): A compliance inspection was conducted by EPA on February 4, 2004, to evaluate compliance with the Storm Water Construction General Permit (CGP) at the construction site of the Comfort Suites, Amarillo, TX. RIBV Amarillo, Inc., was determined to be an operator as defined by the Clean Water Act, but had not applied for permit coverage under the CGP, nor had developed a Storm Water Pollution Prevention Plan (SWPPP). As RIBV Amarillo met the criteria for the Expedited Settlement Offer (ESO), it was offered and accepted with a penalty amount of $11,750.00.