EPA INSPECTION SHOWED THAT DURING TWO-MONTH PERIOD RESPONDENT DID NOT HAVE REQUIRED STORM WATER PERMIT FOR SITE, DID NOT CONDUCT REQUIRED STORM WATER INSPECTIONS, AND DID NOT ADEQUATELY MAINTAIN THE STORM WATER CONTROLS THAT RESPONDENT HAD INSTALLED FOR THE SITE.