Mount Airy Estates, Inc.

Administrative - Formal · FY2008 · — · Final Order With Penalty · 1400007635

—
Penalty
—
Cost recovery
—
Compliance action

Case

Case Number
02-2008-3324
Type
Administrative - Formal
Lead
EPA
Outcome
Final Order With Penalty
Multimedia
—
Self-disclosure
N

Defendants (1)

Summary

This is a 185 acre site, of which 147 acres will be disturbed. Approximately 5 acres were disturbed at the time of the inspection. A State Pollutant Discharge Elimination System (SPDES) General Permit for Stormwater Discharges from Construction Activity (GP-02-01) (CGP) was obtained for the site in 2003. A proposed penalty of $5,250 was determined based on Permit violations including Storm Water Pollution Prevention Plan (SWPPP) deficiencies identified during the compliance evaluation inspection (CEI) conducted January 4, 2008.