The facility was inspected by EPA Contractors on April 10, 2008. The Inspection Checklist was reviewed by R Jamison, EPA. The contractor noted that a failure to install CP on metal piping, failure to maintain interstitial monitoring and provide RD for UST piping. R. Jamison concurred and issued a Field Citation from the desk.