The facility was inspected by EPA Contractors on April 10, 2008. The Inspection Checklist was reviewed by R Jamison. The contractor noted that a failure to continually operate the CP system, and maintain RD on a temporarily closed UST. R. Jamison concurred and issued a Field Citation from the desk.