The facility was inspected by EPA Contractors on December 11, 2007. The Inspection Checklist was reviewed by R Jamison. The contractor noted that there was a failure to adequately operate release detection-interstitial monitoring and did not equip the pressurized lines with an ALLD. R Jamison concurred and issued a Field Citation from the desk.