12/5/2008 - ADMINISTRATIVE ORDER ISSUED. ORDER STATES: DURING THE CSWEI, EPA INSPECTORS OBSERVED THAT STORM WATER CONTROLS WERE NOT BEING OPERATED AND MAINTAINED AT OPTIMUM EFFICIENCY, AS REQUIRED BY PART I.C.2 AND PART II.C.1 OF THE PERMIT; AND DISCHARGES WERE NOT BEING MINIMIZED OR PREVENTED, AS REQUIRED BY PART II.B.2 OF THE PERMIT. SILT FENCING WAS LOCATED WITHIN THE TRIBUTARY OF MARKS CREEK AT THE STREAM CROSSING JUST EAST OF BMP 2.2 ON THE SF-2 PORTION OF THE DEVLOPMENT. THE SILT FENCING WAS IMPOUNDING THE NATURAL FLOW OF THE CREEK. SEDIMENT LOSS WAS OBSERVED IN THE TRIBUTARY OF MARKS CREEK ON EITHER SIDE OF THE STREAM CROSSING AT BIG FALLS DRIVE. SLOPES NEAR THE STREAM CROSSING HAD THE POTENTIAL FOR SEDIMENT LOSS AND NEEDED STABILIZATION. RESPONDENT HAS VIOLATED SECTIONS 301 AND 402(p) OF THE CWA, BY FAILING TO COMPLY WITH THE NCDENR PERMIT.