On November 5, 2008, Region 5 signed an Administrative Order on Consent with TDY Industries, Inc. to complete corrective action work at the Former Teledyne Monarch Rubber Plant 1 in Hartville, Ohio. The consent order requires TDY Industries, Inc. to implement institutional controls; construct and operate a high vacuum dual phase extraction system with air stripper to collect and treat volatile organic compound (VOC) contaminated groundwater; implement enhanced bioremediation through use of enhanced reductive dechlorination; and pave/and or cap and maintain two areas of contaminated surface soils.