THE FACILITY'S RE-ISSUED NPDES PERMIT CONTAINS A MORE STRINGENT LIMIT FOR TOTAL PHOSPHOROUS. THE ORDER REQUIRES THAT THE TOWN CONDUCT AN ENGINEERING STUDY TO DETERMINE WHAT MEASURES ARE REQUIRED TO MEET THE NEW PHOSPHOROUS LIMIT, AND CONSTRUCT THE NEEDED IMPROVEMENTS TO ITS TREATMENT PLANT.