← EPA enforcement cases

BISHARD DEVELOPMENT CORPORATION

Administrative - Formal · FY2005 · — · Final Order With Penalty · 148472

—
Penalty
—
Cost recovery
—
Compliance action

Case

Case Number
03-2005-0173
Type
Administrative - Formal
Lead
EPA
Outcome
Final Order With Penalty
Multimedia
—
Self-disclosure
N

Defendants (1)

Summary

AFTER INSPECTION OF THE COASTAL WALK CONDOMINIUMS, BY REPRESENTATIVES OF THE US EPA, THE BISHARD CONSTRUCTION CORPORATION WAS FOUND IN VIOLATION OF ITS NPDES STORM WATER PERMIT FOR CONSTRUCTION ACTIVITIES. INSPECTORS FROM THE CITY OF VA BEACH HAD, ON NUMEROUS OCCASIONS ALSO FOUND THE COASTAL WALK CONDOMINIUM SITE IN VIOLATION. MANY TIMES, THE SUB-CONTRACTOR, FAILED TO ADDRESS THE FAILING STORM WATER MANAGEMENT FACILITY AND RUNOFF PROBLEMS, AND FAILED TO COMMUNICATE THE SAME ISSUES TO THE BISHARD CONSTRUCTION CORPORATION. THUS, MANY REPAIRS WENT UNCHECKED. SITE HAD NOT PREPARED SELF, SITE INSPECTION REPORTS AND ADDITIONALLY FAILED TO PROTECT STOCK PILES AND PROTECT STORM DRAIN INLETS THAT WERE IN CLOSE PROXIMITY TO THE UNPROTECTED STOCKPILE. BECAUSE BDC HAD DAY TO DAY OPERATIONAL CONTROL OVER THE SITE, THE BISHARD CONSTRUCTION CORPORATION IS LIABLE FOR THE VIOLATIONS UNDER THE CWA.

Source

Authoritative
EPA ECHO
Machine
JSON-LD · Markdown