← EPA enforcement cases

Aries Operating, (Bracken Well No. 13)

Administrative - Formal · FY2005 · — · Final Order With Penalty · 150517

—
Penalty
—
Cost recovery
—
Compliance action

Case

Case Number
06-2005-4374
Type
Administrative - Formal
Lead
EPA
Outcome
Final Order With Penalty
Multimedia
—
Self-disclosure
N

Defendants (1)

Summary

Summary of Findings: Inspections and tests required by 40 CFR Part 112 are not in accordance with written procedures developed for the facility. No training on the operation and maintenance of equipment to prevent discharges. Prior to drainage of diked areas, rainwater is not inspected, vlaves opened and resealed under responsible supervision and records kept of such events. Visual inspections of containers, foundation and support are not conducted periodically for deterioration and maintenance needs. Above ground valves and ipelines are not examined periodically ona scheduled basis for general condition (includes items, such as: flange joints, vlave glands 2nd dodies, drip pans, pipeline supports, bleeder and guage valves, polish rods/stuffing box.

Source

Authoritative
EPA ECHO
Machine
JSON-LD · Markdown