Summary of Findings:
Inspections and tests required by 40 CFR Part 112 are not in accordance with written procedures developed for the facility.
No training on the operation and maintenance of equipment to prevent discharges.
Visual inspections fo containers, foundation and support sare not conducted periodically for deterioration and maintenance needs.
Above ground valves and pipelines are not examined periodically on a scheduled basis for general condition (includes items, such as: flange joints, valve glands 2nd bodies, drip pans, pipeline supports, bleeder and gauge valves, polish rods/stuffing box.