6/6/06 - COMPLIANCE ORDER ISSUED. VIOLATION: RESPONDENT FAILED TO COMPLY WITH THE REQUIREMENTS OF THE CWA BY DISCHARGING STORMWATER INTO WATERS FO THE U.S. FROM ITS FACILITY WITHOUT BENEFIT OF COVERAGE UNDER THE NORTH CAROLINA DEPT OF ENVIRONMENTAL AND NATURAL RESOURCES (NCDENR) PERMIT. ORDER REQUIRES: IMMEDIATELY INSTITUTE AN INSPECTION PROGRAM TO INSPECT ALL EROSION AND SEDIMENTATION CONTROL FAICLITIES AT LEAST ONCE EVERY 7 CALENDAR DAYS AND WITHIN 24 HOURS AFTER ANY STORM EVENT GREATER THAN 0.5 INCHES OF RAIN PER 24 HOUR PERIOD AND TAKE CORRECTIVE ACTION IMMEDIATELY TO CONTROL THE DISCHARGE OF SEDIMENTS IF ANY VISIBLE SEDIMENTATION LEAVES THE DISTURBED LIMITS OF THE SITE. WITHIN 30 DAYS, SUBMIT DOCUMENTATION THAT THIS REQUIREMENT HAS BEEN MET. PROVIDE EPA WITH COPIES OF ALL INSPECTION REPORTS FOR A PERIOD OF 3 MONTHS BEGINNING WITH THE EFFECTIVE DATE OF THIS ORDER. IMMEDIATELY KEEP A REOCRD OF INSPECTIONS WHICH INCLUDES VISIBLE SEDIMENTATION FOUND OUTSIDE THE DISTURBED LIMITS OF THE SITE, AN EXPLANATION OF MEASURES TAKEN TO CONTROL FUTURE RELEASES, AND MEASURES TAKEN TO CLEAN UP SEDIMENT BEYOND THE DISTURBED LIMITS OF THE SITE. WITHIN 30 DAYS, SUBMIT DOCUMENTATION THAT THIS REQUIREMENT HAS BEEN MET. IMMEIDATELY, COMPLY WITH FINAL LIMITATIONS AND CONTROL SPECIFIED FOR STORMWATER DISCHARGES. SPECIFICALLY, PROVIDE MAINTENANCE TO THE SILT FENCING IN AREAS BEHIND THE OUTFALLS, AT THE TEMPORARY SEDIMENTATION BASIN, AT BASINS 3 AND 4 AT THE WEIR AND AT THE DIVER

Source

Authoritative
EPA ECHO
Machine
JSON-LD · Markdown