RHEIN INTERESTS OF CHARLOTTE, LLC / GRAND PALISADES PARKWAY NORTH

Administrative - Formal · FY2005 · — · Unilateral Administrative Order Without Adjudication · 151637

—
Penalty
—
Cost recovery
—
Compliance action

Case

Case Number
04-2005-4776
Type
Administrative - Formal
Lead
EPA
Outcome
Unilateral Administrative Order Without Adjudication
Multimedia
—
Self-disclosure
N

Defendants (1)

Summary

6/6/05 - ADMINISTRATIVE ORDER ISSUED. VIOLATIONS: 1. FAILURE TO AMEND THE EROSION CONTROL PLAN TO INCORPORATE CHANGES IN THE DESIGN OF BEST MANAGEMENT PRACTICES (BMPs); 2. FAILURE TO INSPECT ALL EROSION AND SEDIMENTATION CONTROL FACILITIES AT LEAST ONCE EVERY ONCE EVERY 7 CALENDAR DAYS AND WITHIN 24 HOURS OF A STORM EVENT OF GRATER THAN 0.5 INCHES AS DOCUMENTED IN THE SELF-INSPECTION REPORTS; 3. FAILURE TO: TAKE CORRECTIVE ACTION TO CONTROL THE DISCHARGE OF SEDIMENTS FROM LEAVING THE DISTURBED LIMITS OF THE SITE, AS DOCUMENTED IN THE SELF-INSPECTION REPORTS; BMP MAINTENANCE ISSUES THROUGHOUT THE SITE; FAILURE TO PROVIDE SUFFICIENT STABILIZATION OF SLOPES AND DENUDED AREAS; AND THE DISCHARGE OF SEDIMENTS IN THE RECEIVING STREAM; 4. FAILURE TO COMPLY WITH THE FINAL LIMITATIONS AND CONTROLS AS DOCUMENTED BY THE LACK OF MAINTENANCE OF BMPs THROUGHOUT THE SITE; 5. FAILURE TO PROVIDE OPERATION AND MAINTENANCE NECESSARY TO OPERATE STORM WATER CONTROLS AT OPTIMUM EFFICIENCY, AS EVIDENCED BY THE LACK OF MAINTENANCE OF BMPs THROUGH THE SITE, AND BY FAILING TO PROVIDE SUFFICIENT STABILIZATION TO THE SLOPES AND DENUDED AREAS OF THE SITE. 6. FAILURE TO COMPLY WITH ALL CONDITIONS OF THE PERMIT BY FAILING TO PROVIDE OPERATION AND MAINTENANCE NECESSARY TO OPERATE STORMWATER CONTROLS AT OPTIMUM EFFICIENCY AS EVIDENCED BY THE LACK OF MAINTENANCE OF BMPs THROUGHOUT THE SITE, AND BY FAILING TO PROVIDE SUFFICIENT STABILIZATION TO THE SLOPES AND DENUDED AREAS OF

Source

Authoritative
EPA ECHO
Machine
JSON-LD · Markdown