J&B DEVELOPMENT AND MANAGEMENT, INC. (VILLAGES AT MOSS CREEK)

Administrative - Formal · FY2005 · — · Unilateral Administrative Order Without Adjudication · 152930

—
Penalty
—
Cost recovery
—
Compliance action

Case

Case Number
04-2005-4772
Type
Administrative - Formal
Lead
EPA
Outcome
Unilateral Administrative Order Without Adjudication
Multimedia
—
Self-disclosure
N

Defendants (1)

Summary

7/26/05 - ADMINISTRATIVE ORDER ISSUED. VIOLATIONS: FAILURE TO IMPLEMENT THE EROSION AND SEDIMENTATION CONTROL PLAN AS APPROVED AND OPERATE AND MAINTAIN ALL EROSION AND SEDIMENTATION CONTROL FACILITIES. FAILURE TO TAKE CORRECTIVE ACTION IMMEDIATELY TO CONTROL THE DISCHARGE OF SEDIMENTS. FAILURE TO PROPERLY INSPECT AND KEEP A RECORD OF THE EROSION AND SEDIMENT CONTROL FACILITY INSPECTIONS. ORDER REQUIRES: IMMEDIATELY, BEGIN INSPECTING ALL EROSION AND SEDIMENTATION CONTROL FACILITIES AND STORM WATER RUNOFF DISCHARGES AT LEAST ONCE EVERY 7 CALENDAR DAYS AND WITHIN 24 HOURS AFTER ANY STORM EVEN GREATER THAN 0.5 INCHES OF RAIN PER 24-HOUR PERIOD; MAINTAIN A RAIN GAUGE ON THE SITE AND RECORD RAINFALL AMOUNTS AND DATES. EVERY 30 CALENDAR DAYS, FOR A PERIOD OF 90 DAYS, SUBMIT COPIES OF SUCH INSPECTION REPORTS AND RAINFALL DATA. IMMEDIATELY, TAKE CORRECTIVE ACTION TO CONTROL THE DISCHARGE OF VISIBLE SEDIMENTS LEAVING THE DISTURBED LIMITS OF THE SITE; SPECIFICALLY, PROVIDE SLOPE STABILIZATION, DIVERSION DITCH MAINTENANCE, AND SEDIMENTATION POND REDESIGN AND MAINTENANCE. WITHIN 30 DAYS, SUBMIT DOCUMENTATION THAT THIS REQUIREMENT HAS BEEN MET. IMMEDIATELY, BEGIN KEEPING A RECORD OF INSPECTIONS TO INCLUDE A RECORD OF VISIBLE SEDIMENTATION FOUND OUTSIDE THE DISTURBED LIMITS OF THE SITE, AN EXPLANATION OF MEASURES TAKEN TO CONTROL FUTURE RELEASES, AND A RECORD OF MEASURES TAKEN TO CLEAN UP SEDIMENT BEYOND THE DISTURBED LIMITS OF THE SITE. EVERY 30 CALENDAR DAYS

Source

Authoritative
EPA ECHO
Machine
JSON-LD · Markdown