RESPONDENT VIOLATED ITS GENERAL CONSTRUCTION STORMWATER NPDES PERMIT WHEN IT FAILED TO IMPLEMENT SEVERAL PROVISIONS OF THE EROSION & SEDIMENTATION CONTROL PLAN WHICH IS REQUIRED BY THE PERMIT. VIOLATIONS INCLUDED NOT FENCING STOCK PILES, IMPROPERLY INSTALLING SWALE, AND NOT INSTALLING LOTS' ROCK CONSTRUCTION ENTRANCES.