9/7/05 - COMPLAINT AND COMPLIANCE ORDER ISSUED.
COUNT 1: FAILURE TO REMEDIATE RELEASES OF USED OIL TO THE SOIL.
COUNT 2: FAILURE TO LABEL CONTAINERS OF USED OIL.
COUNT 3: FAILURE TO MAKE A HAZARDOUS WASTE DETERMINATION ON SOLID WASTES GENERATED BY THE FACILITY.
COUNT 4: FAILURE TO PROPERLY MANAGE UNIVERSAL WASTE BATTERIES.
COMPLIANCE ORDER:
WITHIN 60 CALENDAR DAYS, RESONDENT SHALL SUBMIT A SITE WIDE FACILITY INVESTIGATION WORKPLAN TO EPA AND TO FDEP DESCRIBING HOW RESPONDENT WILL SAMPLE ALL AREAS OF STAINED SOIL AT ITS FACILITY. SOILS IN THESE AREAS SHALL BE ANALYZED FOR THE PRESENCE OF HAZARDOUS WASTE AND HAZARDOUS WASTE CONSTITUENTS, AS WELL AS THE PRESENCE OF USED OIL. THE SITE WIDE FACILITY INVESTIGATION PLAN SHALL INCLUDE, AT A MINIMUM: (A) A PLAN TO COLLECT AND ANALYZE REPRESENTATIVE SAMPLES OF APPROPRIATE SIZE, DEPTH, AND LOCATION TO DETERMINE THE NATURE AND EXTENT OF CONTAMINATION; (B) A DESCRIPTION OF METHODS USED FOR LOCATING AND INSTALLING ANY NECESSARY UP GRADIENT AND DOWN GRADIENT GROUND WATER MONITORING WELLS; (C) A PLAN TO COLLECT AND ANALYZE ANY NECESSARY REPRESENTATIVE GROUNDWATER SAMPLES OF APPROPRIATE DEPTH AND LOCATION TO DETERMINE THE NATURE AND EXTENT OF CONTAMINATION OF GROUNDWATER; (D) A DESCRIPTION OF METHODS USED TO SAMPLE SOIL AND GROUNDWATER; (E) AN IDENTIFICATION OF THE CONTAMINANTS OF CONCERN AND THE ANALYTICAL METHODS USED TO ANALYZE FOR THE CONTAMINANTS OF CONCERN; (F) A SCHEDULE FOR PLAN IMPLEMENTATION AND FINALIZATION