← EPA enforcement cases

RAMEY DEVELOPMENT CORP. - AUTUMN WOODS PHASE 3

Administrative - Formal · FY2005 · — · Final Order With Penalty · 158847

—
Penalty
—
Cost recovery
—
Compliance action

Case

Case Number
04-2005-4515
Type
Administrative - Formal
Lead
EPA
Outcome
Final Order With Penalty
Multimedia
—
Self-disclosure
N

Defendants (1)

Summary

9/28/05 - CONSENT AGREEMENT AND FINAL ORDER, ASSESSING A PENALTY OF $50,000. RESPONDENT SHALL MAKE PAYMENT WITHIN THIRTY DAYS. RESPONDENT FAILED TO FAILED TO COMPLY WITH PARTS I.B.2, II.B.1 AND II.B.2 OF THE PERMIT BY FAILING TO TAKE CORRECTIVE ACTION IMMEDIATELY TO CONTROL THE DISCHARGE OF SEDIMENTS. EXTENSIVE SEDIMENT WAS DEPOSITED IN THE CREEK AND WETLANDS AT THE FACILITY IN SEVERAL LOCATIONS. RESPONDENT FAILED TO COMPLY PARTS I.B.1, I.B.2, I.B.3 AND II.B.1 OF THE PERMIT BY FAILING TO KEEP A RECORD OF THE EROSION AND SEDIMENT CONTROL SITE INSPECTIONS. RESPONDENT FAILED TO COMPLY WITH PARTS 8.A.2, I.C.1, I.C.2, II.B.1, II.B.2, AND II.C.1 OF THE PERMIT BY FAILING TO ADEQUATELY INSTALL AND/OR MAINTAIN TEMPORARY OR PERMANENT MEASURES TO CONTROL AND RETAIN SEDIMENT, INCLUDING SILT FENCING, CONSTRUCTION ENTRANCES AND EXITS, STORM INLET PROTECTION, DIVERSION DITCHES, OUTLET AND OUTFALL PROTECTION, GROUNDCOVER, SEDIMENTATION BASINS AND SILT TRAPS; AND BY INSTALLING AND CONNECTING STORM DRAIN INFRASTRUCTURE INTO PERMANENT OUTFALLS PRIOR TO SITE STABILIZATION INSTEAD OF CONNECTING TO TEMPORARY SEDIMENTATION BASINS.

Source

Authoritative
EPA ECHO
Machine
JSON-LD · Markdown