9/30/05 - COMPLAINT FILED, PROPOSING A PENALTY OF $157,500. RESPONDENT FAILED TO COMPLY WITH PART I.B.1 OF THE PERMIT BY FAILING TO INSPECT ALL EROSION AND SEDIMENTATION CONTROL FACILITIES AT LEAST ONCE EVERY SEVEN (7) CALENDAR DAYS AND WITHIN TWENTY-FOUR (24) HOURS AFTER ANY STORM EVENT GREATER THAN O.5 INCHES OF RAN PER TWENTY-FOUR (24) HOUR PERIOD. RESPONDENT FAILED TO COMPLY WITH I.B.2 OF THE PERMIT FAILING TO INSPECT ALL STORM WATER RUNOFF CHARGES AT THE SAME FREQUENCY AS THE EROSION AND SEDIMENTATION CONTROL FACILITIES AND TO TAKE CORRECTIVE ACTION IMMEDIATELY TO CONTROL THE DISCHARGE OF SEDIMENTS IF ANY VISIBLE SEDIMENTATION LEAVES THE DISTURBED LIMITS OF THE FACILITY. RESPONDENT FAILED TO COMPLY WITH PART I.B.3 OF THE PERMIT BY FAILING TO KEEP A RECORD OF INSPECTIONS WHICH INCLUDE VISIBLE SEDIMENTATION FOUND OUTSIDE THE DISTURBED LIMITS OF THE FACILITY, AN EXPLANATION OF MEASURES TAKEN TO CONTROL FUTURE RELEASES, AND MEASURES TAKEN TO CLEAN UP SEDIMENT BEYOND THE DISTURBED LIMITS OF THE FACILITY. RESPONDENT FAILED TO COMPLY WITH PART I.C.1 OF THE PERMIT BY FACILITY TO COMPLY WITH FINAL LIMITATIONS AND CONTROLS SPECIFIED FOR STORM WATER DISCHARGES ONCE DISTRIBANCE HAS BEGUN ON THE FACILITY UNTIL COMPLETION OF CONSTRUCTION OR DEVELOPMENT AND ESTABLISHMENT OF A PERMANENT GROUND COVER. RESPONDENT FAILED TO COMPLY WITH PART I.C.2 OF THE PERMIT BY FAILING TO PROVIDE OPERATION AND MAINTENANCE NECESSARY TO OPERATE STROM WATER CONTROLS AT OPTIMUM EFFICIENCY AS NOTED. RES