← EPA enforcement cases

ALERIS INTERNATIONAL, INC. - TN (NATIONAL CASE) (LEAD) (KY added)

Judicial · FY2005 · — · Final Order With Penalty · 159397

—
Penalty
—
Cost recovery
—
Compliance action

Case

Case Number
04-2005-9045
Type
Judicial
Lead
EPA
Outcome
Final Order With Penalty
Multimedia
—
Self-disclosure
N

Defendants (1)

Summary

As part of the Consent Decree, EPA resolved the following allegations described in EPA's Amended Complaint filed on August 4, 2009: (1) failure to design and install adequate capture and collection systems and to submit information demonstrating their conformance; (2) failure to conduct adequate performance testing; (3) failure to properly establish and maintain total reactive flux injection rate and to record flux injection; (4) failure to maintain and record molten metal level at sidewell furnaces; (5) failure to prepare and implement adequate operation, maintenance and monitoring plans and startup, shutdown malfunction plans; (6) failure to maintain free-flowing lime in continuous lime-injected fabric filters; (7) failure to demonstrate compliance with applicable emission limits at Morgantown Delacquering kiln; and (8) failure to apply for a title V permit for Chicago Heights facility.

Source

Authoritative
EPA ECHO
Machine
JSON-LD · Markdown