← EPA enforcement cases

Pesticides Warehouse III OU1

Administrative - Formal · FY2005 · — · Final Order With Specified Cost Recovery · 159678

—
Penalty
—
Cost recovery
—
Compliance action

Case

Case Number
02-2005-2025
Type
Administrative - Formal
Lead
EPA
Outcome
Final Order With Specified Cost Recovery
Multimedia
—
Self-disclosure
N

Defendants (2)

Summary

Under the Agreement and Order, the Respondent will perform a remedial investigation and feasibility study (RI/FS) for Operable Unit 1 at the Pesticide Warehouse III Superfund Site, located in Manati, Puerto Rico. Additionally, under the Agreement and Order, Respondent will reimburse EPA for its past costs at the Site in twelve monthly payments plus interest at the current Superfund interest rate. The Order also calls for the reimbursement of response costs incurred by EPA in overseeing Respondent's implementation of the Work required by the Order. Respondents to the Order are owner/operators of the Site property. EPA detected hazardous substances, including metals and pesticides, in the soils and groundwater at the Site. Pursuant to Section 105(a) of the Comprehensive Environmental Response, Compensation, and Liability Act, as amended (CERCLA), 42 U.S.C. 9605(a), EPA placed the Site on the National Priorities List. Additionally, earlier this year, EPA sampled soils at the Site and found high concentrations of pesticides around a drainage ditch and sinkhole at the Site. Since runoff across the Site flows into the drainage ditch and sinkhole, the contamination around the ditch and sinkhole constitutes a continuing release and threat of release of hazardous substances from the surface of the Site into the groundwater. As part of EPA's strategy for investigating and remediating the Site, EPA determined that the Site investigation and remediation should be addressed in

Source

Authoritative
EPA ECHO
Machine
JSON-LD · Markdown