1/18/06 - CONSENT AGREEMENT FILED, ASSESSING A PENALTY OF $11,000. RESPONDENT SHALL SUBMIT THE FIRST MONTHLY INSTALLMENT PAYMENT OF $463.12, WHICH INCLUDES INTEREST, WITHIN 30 CALENDAR DAYS. 23 ADDITIONAL INSTALLMENTS IN THE SAME AMOUNT SHALL BE PAID NO LATER THAN THE 30TH OF EACH SUBSEQUENT MONTH UNTIL THE BALANCE IS PAID.
EPA ALLEGATIONS AND DETERMINATIONS:
LEGENDS OPERATED THE FACILITY AS A TREATMENT, STORAGE, AND DISPOSAL FACILITY AND A LARGE QUANTITY GENERATOR OF HAZARDOUS WASTE DURING A MARCH 22, 2002, INSPECTION BY EPA AND SCDHEC.
DURING THE MARCH 22, 2002, INSPECTION:
A. LEGENDS STRIPPED AND REPAINTED AIRPLANE EXTERIORS AND REFURBISHED AIRPLANE INTERIORS.
B. LEGENDS FAILED TO MAKE A HAZARDOUS WASTE DETERMINATION FOR THE STRIPPING WASTE FROM THE STRIPPING OPERATION IN THE STRIPPING HANGER AND THE SOLVENT SOAKED PAPER TOWELS IN THE FINISHING HANGER.
C. LEGENDS IN IN VIOLATION OF 40 CFR 262.11 AND SCHWMR R.61-79.262.11 FOR FAILING TO MAKE A HAZARDOUS WASTE DETERMINATION FOR ITS STRIPPING WASTE.
D. LEGENDS FAILED TO COMPLY WITH MULTIPLE CONTAINER MANAGEMENT REQUIREMENTS IN THE PAINTING HANGER AND AT THE TANK TREATMENT SYSTEM.
E. LEGENDS FAILED TO PROPERLY CLOSE A CONTAINER OF SPENT METHYL ETHYL KETONE IN THE PAINTING HANGER.
F. LEGENDS FAILED TO PROPERLY LABEL ONE CONTAINER OF HAZARDOUS WASTE AT THE TANK TREATMENT SYSTEM WITH THE WORDS HAZARDOUS WASTE OR WITH WORDS THAT IDENTIFY THE CONTENTS OF THE CONTAINER.
G. LEGENDS ACCUMULAT