← EPA enforcement cases

PACE DEVELOPMENT GROUP, INC.

Administrative - Formal · FY2006 · — · Unilateral Administrative Order Without Adjudication · 172818

—
Penalty
—
Cost recovery
—
Compliance action

Case

Case Number
04-2006-4757
Type
Administrative - Formal
Lead
EPA
Outcome
Unilateral Administrative Order Without Adjudication
Multimedia
—
Self-disclosure
N

Defendants (1)

Summary

2/14/06 - COMPLIANCE ORDER ISSUED. VIOLATIONS: A. SILT FENCING ALONG THE UTILITY EASEMENT ON THE SOUTHERN PORTION OF THE SITE WAS IN NEED OF MAINTENANCE BASED ON SEVERAL LOCATIONS ALONG THE SILT FENCING THAT WERE BEING UNDERCUT AND ALLOWING SEDIMENT TO DISCHARGE OFF-SITE. THEREFORE, PACE DEVELOPMENT GROUP, INC., VIOLATED PART VI.N OF THE PERMIT FOR FAILING TO PROPERLY OPERATE AND MAINTAIN ALL FACILITIES AND SYSTEMS OF TREATMENT AND CONTROL WHICH ARE INSTALLED OR USED BY THE PERMITTEE TO ACHIEVE COMPLIANCE WITH THE CONDITIONS OF THE PERMIT. B. CRITICAL AREAS IN NEED OF MAINTENANCE ARE DETENTION PONDS #4 AND #7. BOTH PONDS ARE MORE THAN TWO-THIRDS FULL OF SEDIMENT AND NEEDED TO BE PROPERLY MAINTAINED. POND #4 WAS DISCHARGING SEDIMENT INTO THE UTILITY EASEMENT BECAUSE IT WAS NEAR CAPACITY. POND #7 WAS ALSO DISCHARGING SEDIMENT AT THE OUTFALL STRUCTURE DUE TO THE CAPACITY OF SEDIMENT AND THE WORKING CONDITION OF THE OUTLET STRUCTURE. THEREFORE, PACE DEVELOPMENT GROUP, INC., VIOLATED PART VI.N OF THE PERMIT FOR FAILING TO PROPERLY OPERATE AND MAINTAIN ALL FACILITIES AND SYSTEM OF TREATMENT AND CONTROL WHICH ARE INSTALLED OR USED BY THE PERMITTEE TO ACHIEVE COMPLIANCE WITH THE CONDITIONS OF THE PERMIT. ORDER REQUIRES: A. IMMEDIATELY OPERATE AND MAINTAIN ALL FACILITIES AND SYSTEM OF TREATMENT AND CONTROL ( AND RELATED APPURTENANCES) WHICH ARE INSTALLED OR USED TO ACHIEVE COMPLIANCE WITH THE CONDITIONS OF THE PERMIT AND WITH THE REQUIREMENTS OF THE SWPPP. SP

Source

Authoritative
EPA ECHO