RESPONDENT REPEATEDLY OPERATED TWO COMBUSTION ENGINEERING BOILERS AT THE SAME TIME THAT IT WAS OPERATING BOILER #6 , A VIOLATION OF CONDITION C(4) OF THE TITLE V PERMIT; AND FAILED TO MAINTAIN RECORDS FOR TWO OTHER CE BOILERS, IN VIOLATION OF CONDITION D(3) OF THE TITLE V PERMIT.
THE PROPOSED MODIFICATION TO THE CONSENT DECREE PROVIDES ADDITIONAL TIME FOR ASR TO INSTALL ONE OF THE ULTRA LOW-NOX BURNERS, AND REQUIRES THAT ASR COLLECT AND SUBMIT CERTAIN DATA REGARDING NOX EMISSIONS. FURTHER, THE PROPOSED MODIFICATION REQUIRES AN ADDITIONAL REDUCTION IN ANNUAL NOX EMISSIONS.