An RMP inspection was conducted on April 24, 2008 at the Columbia Colstor-Woodland Processing facility. Columbia Colstor failed to comply with 40 CFR Part 68 for process safety information and equipment, electrical classification, relief system design and design basis, ventilation system design, mechanical Integrity and hazard assessment.