Count 1: Failure to Notify EQB of Required Information for UST Systems 1 and 2
Count 2: Failure to Provide Required Release Detection Monitoring and to Maintain Release Detection Records for Tanks 1 and 2
Count 3: Failure to Provide Required Release Detection Monitoring and to Maintain Release Detection Records for Pressurized Piping for UST Systems 1 and 2
Count 4: Failure to Conduct an Annual Test of the Operation of the Automatic Line Leak Detectors (ALLDs) for Pressurized Piping for UST Systems 1 and 2 and to Maintain Records of the Tests