Summary

1/21/2010 - ADMINISTRATIVE COMPLIANCE ORDER ISSUED. BASED ON EXCESSIVE MONITORING DOWNTIME FOR INCINERATORS, EPA FINDS THAT THE CDC DID NOT ADEQUATELY MAINTAIN AND OPERATE ITS CONTINUOUS MONITORING SYSTEM (CMS) IN A CONTINUOUS MANNER, AS REQUIRED BY CONDITION NO. 5.2.5 OF ITS TITLE V PERMIT AND CONDITION NO. 5.2.8 OF ITS TITLE V PERMIT AMENDMENT (NO. 9431-089-0005-V-01-3). BASED ON EXCESSIVE MONITORING DOWNTIME FOR BOILERS, EPA FINDS THAT THE CDC DID NOT ADEQUATELY MAINTAIN AND OPERATE ITS PEMs IN A CONTINUOUS MANNER, AS REQUIRED BY ITS TITLE V PERMIT, AS SPECIFIED BY CONDITION NO. 5.2.2. EPA FINDS THAT CDC DID NOT PERFORM ITS ANNUAL PERFORMANCE TEST ON INC3 AT THE REQUIRED 12 MONTH INTERVAL, AS REQUIRED BY CONDITION NO. 4.2.9 OF THE TITLE V PERMIT AMENDMENT (NO. 9431-089-0005-V-01-3). CDC DID NOT CONDUCT A RATA ON BOILERS BL04, BL07, AND BL10 FOR THE ENTIRE 2008 CALENDAR YEAR, AS REQUIRED BY GEORGIA RULE 391-3-1-.02(6)(b)(1)(vi). VIOLATION OF GEORGIA RULE 391-3-1-.02(6)(b)(1)(vi) IS ALSO A VIOLATION OF THE EPA APPROVED GEORGIA SIP, WHICH REQUIRES NOx EMISSION LIMITS AND CONTROLS TO PROVIDE RFP TOWARD ATTAINMENT FOR THE ATLANTA OZONE ATTAINMENT AREA. ORDER REQUIRES: CDC SHALL UPDATE AND SUBMIT ALL OF ITS CDC ENVIRONMENTAL PROCEDURES (CEPs) TO REFLECT PROVISIONS CONTAINED IN ITS CURRENTLY REVISED PART 70 OPERATING PERMIT NO. 9431-089-0005-V-01-0, EFFECTIVE FEB 11, 2009, WITHIN 30 DAYS. CDC SHALL SUBMIT ITS SOPs FOR THE OPERATION OF ITS BOILERS WITHIN 3

Source

Authoritative
EPA ECHO
Machine
JSON-LD · Markdown