6/29/06 - ADMINISTRATIVE ORDER ISSUED. VIOLATION: FAILURE TO CERTIFY TO EPA THAT THE SYSTEM HAD PREPARED OR REVISED, WHERE NECESSARY, AN EMERGENCY RESPONSE PLAN THAT INCORPORATES THE RESULTS OF THE COMPLETED VULNERABILITY ASSESSMENT, AS REQUIRED BY SECTION 1433(b) OF THE SDWA. THIS CERTIFICATION WAS REQUIRED NOT LATER THAN 6 MONTHS AFTER THE VULNERABILITY ASSESSMENT WAS COMPLETED.