THIS CASE CONCERNS THE FAILURE OF AMERICAN FRUCTOSE DECATUR, INC. TO COMPLY WITH REQUIREMENTS OF THE NEW SOURCE PERFORMANCE STANDARDS (NSPS) FOR INDUSTRIAL, COMMERCIAL AND INSTITUTIONAL STEAM GENERATING UNITS, 40 C.F.R., PART 60, SUBPART DB, AND THE GENERAL PROVISIONS CONTAINED IN 40 C.F.R. PART 60, SUBPART A, OF ITS COAL-FIRED BOILER AND ITS GAS AND OIL-FIRED BOILER USED IN THE MANUFACTURE OF HIGH FRUCTOSE CORN SYRUP AND CORN STARCH AT ITS DECATUR, AL FACILITY. BASED ON AN INSPECTION CONDUCTED BY THE ALABAMA DEPART- MENT OF ENVIRONMENTAL MANAGEMENT, IT WAS DETERMINED THAT AMERICAN FRUCTOSE FAILED TO INSTALL A CONTINUOUS MONITORING SYSTEM FOR MEASURING NITROGEN OXIDES EMISSIONS ON THE BOILERS AS REQUIRED BY 40 C.F.R. SECTION 60.48B(B) AND FAILED TO CONDUCT AN INITIAL PERFORMANCE TESTS FOR NITROGEN OXIDES ON THE TWO BOILERS WITHIN THE REQUIRED TIME PERIOD IN VIOLATION OF 40 C.F.R. SECTION 60.8. THE RESULTS OF AMERICAN FRUCTOSE'S FOURTH QUARTER NITROGEN OXIDES EXCESS EMISSIONS REPORT INDICATE THAT AMERICAN FRUCTOSE ALSO VIOLATED OTHER SUBSECTIONS OF 40 C.F.R. SECTION 60.48B, AND SECTIONS 60.13(D)(1) REQUIRING MONITORING DATA, DAILY CALIBRATIONS, AND MAINTENANCE OF THE NITROGEN OXIDES CONTINUING MONITORING SYSTEM. AMERICAN FRUCTOSE ALSO VIOLATED 40 C.F.R. SECTION 60.43(D)(1) OF PARTICULATE MATTER STANDARDS.