FAILURE TO PROVIDE NOTICE OF ANY PLANNED PHYSICAL ALTERATIONS OR ADDITIONS TO THE PERMITTED FACILITY. MODIFICATION OF THE CONSTRUCTION CHARACTERISTICS OF A PERMITTED INJECTION WELL WITHOUT PRIOR APPROVAL OF THE DIRECTOR. FAILURE TO DEMONSTRATE THE MECHANICAL INTEGRITY OF THE INJECTION WELL AT LEAST ONCE EVERY 5 YEARS AS REQUIRED BY THE PERMIT.