HOOSIER ENERGY RURAL ELECTRIC

Judicial · FY1984 · — · Final Order With Penalty · 25301

$40K
Penalty
—
Cost recovery
—
Compliance action

Case

Case Number
05-1984-0059
Type
Judicial
Lead
EPA
Outcome
Final Order With Penalty
Multimedia
N
Self-disclosure
N

Defendants (1)

Summary

NATURE OF THE CASE HOOSIER ENERGY RURAL ELECTRIC COOPERATIVE, INC. OWNS AND OPERATES TWO COAL-FIRED BOILERS AT ITS MEROM GENERATING STATION. THESE BOILERS ARE SUBJECT TO NEW SOURCE PERFORM- ANCE STANDARDS FOR FOSSIIL-FUEL-FIRED STEAM GENERATORS, 40 C.F.R. PART 60, SUBPART D. THE BOILERS ARE OPERATED IN VIOLATION OF THE APPLICABLE NSPS SULFUR DIOXIDE EMISSION LIMITATION, OPERATION AND MAINTENANCE REQUIREMENTS, AND RE- QUIREMENT FOR CONTINUOUS MONITORING OF SULFUR DIOXIDE EMISSIONS. ACTUAL EMISSIONS DURING 1983 WERE APPROXIMATELY 71,500 TONS SULFUR DIOXIDE. ALLOWABLE EMISSIONS WERE AP- PROXIMATELY 30,700 TONS. CAUSE OF ACTION SECTION 113(B) OF THE CLEAN AIR ACT, 42 U.S.C. SECTION 7413(B), AUTHORIZES THE ADMINISTRATOR OF THE UNITED STATES ENVIRONMENTAL PROTECTION AGENCY TO COMMENCE A CIVIL ACTION TO ABATE VIOLATIONS OF THE ACT, 42 U.S.C. SECTION 7411(E). SECTION 111(E) PROHIBITS NEW SOURCE OPERATION IN VIOLATION OF APPLICABLE NSPS. PROPOSED REMEDY HOOSIER ENERGY MUST INITIATE IMPROVED OPERATION AND MAINTENANCE PROCEDURES AND DESIGN MODIFICATIONS TO THE LIMESTONE FLUE GAS DESULFURIZATION SYSTEM TO ACHIEVE COM- PLIANCE WITH THE APPLICABLE NSPS. THE RELIEF SOUGHT IN- CLUDES AN INJUNCTION REQUIREING DEFEND

Source

Authoritative
EPA ECHO
Machine
JSON-LD · Markdown