The facility was inspected by EPA Contractors on January 14, 2010. The Inspection Checklist was reviewed by EPA. The contractor noted that there was a failure to provide overfill prevention, monitor tanks, have an annual tightness test and provide release detection for piping. EPA concurred and issued a Field Citation from the desk.