The facility was inspected by EPA Contractors on February 8, 2011. The Inspection Checklist was reviewed by EPA. The contractor noted that there was a failure to maintain documentation of release detection and conduct the annual test of the lines. EPA concurred and issued a Field Citation from the desk.