ANTERO RESOURCES CORPORATION FILLED CHERRYCAMP RUN, ITS TRIBUTARIES, AND WETLANDS ASSOCIATED WITH THE CONSTRUCTION OF THE MARY POST NATURAL GAS PAD SITE. AN UNNAMED TRIBUTARY TO CHERRYCAMP RUN WAS PIPED UNDER THE NATURAL GAS DRILLING PAD AND APPROXIMATELY 150-FT OF OPEN CHANNEL WAS LINED WITH RIPRAP. THE CONSTRUCTION OF A FRESHWATER IMPOUNDMENT ON THE SOUTH SIDE OF CHERRYCAMP RUN IMPACTED CHERRYCAMP RUN AND FILLED AN UNNAMED TRIBUTARY.