The facility was inspected by EPA Contractors on May 19, 2010. The Inspection Checklist was reviewed by EPA. The contractor noted that there was a failure to maintain release detection records, provide overfill on four USTs and have annual line tightness tests. EPA concurred and issued a Field Citation from the desk.