WALTON - A CORE CONSTRUCTION CO./THIRD RECRUIT TRG. BATTALION COMPLEX-MCRD (FF)

Administrative - Formal · FY2011 · — · Unilateral Administrative Order Without Adjudication · 2600048160

—
Penalty
—
Cost recovery
—
Compliance action

Case

Case Number
04-2011-4774
Type
Administrative - Formal
Lead
EPA
Outcome
Unilateral Administrative Order Without Adjudication
Multimedia
—
Self-disclosure
N

Defendants (2)

Summary

8/22/2011 - ADMINISTRATIVE ORDER ISSUED. ORDER STATES: RESPONDENT FAILED TO COMPLY WITH THE SCHEC PERMIT, AND ALSO FOR DISCHARGES NOT AUTHORIZED BY THE SCDHEC PERMIT. ON APRIL 4, 2011, WALTON SUBMITTED A WRITTEN RESPONSE TO THE NPDES INSPECTION OBSERVATION FORM STATING THAT: A. DAMAGED AND IMPROPERLY INSTALLED SILT FENCE THROUGHOUT THE SITE HAD BEEN REPLACED. AN ADDITIONAL ROW OF SILT FENCE WAS ALSO INSTALLED IN CRITICAL AREAS, ESPECIALLY NEAR THE MARSH. B. RIP-RAP PLACED AT BOTH ENDS OF THE MAN-MADE TRENCH TO DECREASE THE WATER'S FLOW RATE. C. THE PUMP THAT HAD BEEN PUMPING SEDIMENT-LADEN TRENCH TO DECREASE THE WATER'S FLOW RATE. D. SILT FENCING AND RIP-RAP WERE REPAIRED OR REINFORCED ADJACENT TO THE OUTFALL STRUCTURE, AND ALL WATER FLOW HAS BEEN REDIRECTED BACK ONTO A LOW-LAYING AREA ONSITE. A TEMPORARY SEDIMENT BASIN HAS BEEN CONSTRUCTED UNTIL FINAL STABILIZATION IS ACHIEVED. ORDER REQUIRES: A. IMMEDIATELY UPON RECEIPT OF THIS ORDER, AS REQUIRED BY PARTS 3.3.C.1, 3.11.b AND 3.11.C OF THE PERMIT, UPDATE THE SWPPP TO INCLUDE THE ADDITIONAL STORMWATER DISCHARGE POINT AND BMPs THAT WERE INSTALLED AFTER THE EPA'S INSPECTION. WITHIN THIRTY (30) DAYS OF RECEIPT OF THIS ORDER, SUBMIT DOCUMENTATION THAT THIS REQUIREMENT OF THE ORDER HAS BEEN MET. B. IMMEDIATELY UPON RECEIPT OF THIS ORDER, AS REQUIRED BY PARTS 3.6.A, 3.6.B, 3.13.1, 3.13.D, 3.13.3 AND 4.4 OF THE PERMIT, CONTINUE TO INSPECT AND MAINTAIN BMPs. WITHIN THIRTY (30) DAYS OF RECEIPIT OF THIS ORDER,

Source

Authoritative
EPA ECHO
Machine
JSON-LD · Markdown