ORDER STATES:
BASED ON THE INFORMATION PROVIDED TO EPA, IT WAS DETERMINED THAT MONITORING WAS CONDUCTED AT TWO (2) MONITORING LOCATIONS FOR TTHMs AND HAA5s AS REQUIRED BY 40 CFR SECTION 141.601(b) NOR HAD THE SYSTEM PREPARED ANALYTICAL RESULTS OF COMPLIANCE MONITORING AS REQUIRED BY SECTION 141.601(c)(1). THEREFORE, THE SYSTEM IS IN VIOLATION OF 40 CFR SECTIONS 141.601(b) AND 141.601(c)(1).
IN ACCORDANCE WITH PROVISIONS OF 40 CFR SECTION 141.600(c), GROUNDWATER SYSTEMS SERVING LESS THAN TEN THOUSAND (10,000) PERSONS ARE REQUIRED TO SUBMIT AN IDSE REPORT BY JULY 1, 2010.
THE SYSTEM FAILED TO SUBMIT AN INITIAL IDSE REPORT BY JULY 1, 2010 TO EPA. THEREFORE, THE SYSTEM IS IN VIOLATION OF 40 CFR SECTION 141.600(c)(1.
ORDER REQUIRES:
THE SYSTEM SHALL MONITOR DURING THE MONTHS OF NOVEMBER 2011, FEBRUARY 2012, MAY 2012 AND AUGUST 2012. THE MONITORING SHALL BE CONDUCTED IN ACCORDANCE WITH THE PROVISIONS OF 40 CFR SECTION 141.601(b) AND 141.601(c)(1).
NO LATER THAN OCTOBER 1, 2012, THE SYSTEM SHALL SUBMIT TO EPA A COMPLETE IDSE REPORT PURSUANT TO 40 CFR SECTION 141.601(c)(1).
WITHIN TEN (10) DAYS OF RECEIPT OF THIS ORDER, THE SYSTEM MUST GIVE PUBLIC NOTICE TO PERSONS SERVED BY THE WATER SYSTEM IN ACCORDANCE WITH 40 CFR SECTION 141.201 AND PROVIDE A COPY OF THAT NOTICE TO EPA.