JOCO CONSTRUCTION, LLC / LIBERTY/PALMETTO POINT SUBDIVISION

Administrative - Formal · FY2012 · — · Final Order With Penalty · 2600103252

—
Penalty
—
Cost recovery
—
Compliance action

Case

Case Number
04-2012-4500
Type
Administrative - Formal
Lead
EPA
Outcome
Final Order With Penalty
Multimedia
—
Self-disclosure
N

Defendants (2)

Summary

1/24/2012 - CONSENT AGREEMENT AND FINAL ORDER ISSUED, ASSESSING A PENALTY OF $1,500, DUE WITHIN 30 DAYS. ALLEGATIONS: ON MARCH 30, 2011, EPA AND SCDHEC PERFORMED A COMPLIANCE STORMWATER EVALUATION INSPECTION (CSWEI) AT THE DEVELOPMENT TO EVALUATE THE TREATMENT AND DISPOSAL OF STORMWATER. DURING THE CSWEI, EPA INSPECTORS OBSERVED THE FOLLOWING: A. THE SWPPP, COPY OF THE PERMIT, NOTICE OF INTENT AND NOTICE OF PERMIT COVERAGE LETTER WERE NOT RETAINED ON-SITE, NOR WAS A NOTICE OF THEIR LOCATION POSTED AT THE ENTRANCE OF THE CONSTRUCTION SITE. B. THE SILT FENCING THAT WAS PLACED ON-SITE WAS ALONG THE ROAD (SVANNAH HIGHWAY) ONLY. ADD'L AREAS ALONG THE SOUTHERN PORTION OF THE DEVELOPMENT WERE IN NEED OF SILT FENCING. EXISING SILT FENCING WAS NOT PROPERLY MAINTAINED. EPA ISSUED AO CWA-04-2011-4769 ON JULY 27, 2011 REQUIRING COMPLIANCE WITH THE PERMIT AND THE CWA, AND DOCUMENTATION SHOWING ITS CMOPLIANCE THEREWITH. ON AUG 15, 2011, RESPONDENT SUBMITTED COPIES OF WEEKLY INSPECTION REPORTS IN RESPONSE TO THE AO. BASED UPON EPA'S REVIEW OF THE INSPECTION REPORTS AND ITS OBSERVATIONS DURING THE MAR 30, 2011 CSWEI, EPA FOUND THAT RESPONDENT FAILED TO LIST ACCURATE AMOUNTS OF RAINFALL FOR EACH STORM EVENT IN INCHES, LOCATIONS OF BMPs REQUIRING MAINTENANCE, LOCATIONS OF BMPs FAILING TO OPERATE AS DESIGNED OR PROVEN INADEQUATE, LOCATIONS WHERE ADD'L BMPs WERE NEEDED, AND CORRECTIVE ACTION NEEDED AS REQUIRED BY PART 3.10.G OF THE PERMIT. THEREFORE, RESPONDENT VIOLATED CWA

Source

Authoritative
EPA ECHO
Machine
JSON-LD · Markdown