AT FOUR CONSTRUCTION SITES IN VIRGINIA AND ONE CONSTRUCTIONS SITE IN MARYLAND WHERE TH TURNER OR TOMPKINS WAS THE OPERATOR, THE RESPONDENT VIOLATED REQUIREMENTS OF THE APPLICABLE GENERAL NPDES STORMWATER PERMITS. VIOLATIONS AT THE VARIOUS SITES INCLUDED FAILING TO PROPERLY INSTALL, OPERATE AND/OR MAINTAIN EROSION AND SEDIMENTATION CONTROLS, FAILING TO KEEP THE STORMWATER POLLUTION PREVENTION PLAN ON SITE AS REQUIRED BY THE PERMIT, AND FAILING TO CONDUCT ALL THE REQUIRED SELF-INSPECTIONS.